Client: City of Redmond
Role: Lead Roadway Engineer | CH2M
Dates: May 2012 to November 2012

Stephanie served as the roadway design lead for the 160th Avenue NE Extension Project. Her work included conceptual roadway design alternative development, evaluation, selection, and budget level cost estimates to improve the safety of all modes of travel, accommodate the increased need for additional vehicle capacity, and provides essential arterial linkages outside of Redmond’s downtown core. These roadway alternatives balanced the needs of future vehicular traffic along with the needs of pedestrians, bicycles, and equestrians; minimized the disturbance to the environment and properties; and defined a solution that is practical and economically feasible for the City.